Building or Developing on Land With an Existing Well
Plugging old wells on the right part of the schedule, before they hold up the job.
Old wells and new construction rarely mix well. A forgotten casing in the middle of a pad site, under a future driveway or in the path of a utility trench can stop site work while somebody works out what it is. On the Treasure Coast, where so much new building happens on former groves, pasture and older home sites, it happens often.
Under the South Florida Water Management District rule, an abandoned well has to be plugged from the bottom to the top with grout by a licensed water well contractor, under a permit. The owner of the property is responsible. On a construction or development site, the practical question is when that work fits in the schedule.
When Abandonment Becomes Part of the Project
Sequencing Against the Construction Schedule
| Stage | What to do about the well |
|---|---|
| Due diligence | Locate wells on the property and get an assessment and estimate |
| Before clearing | Mark and protect known wellheads so equipment does not break or bury them |
| Before site work | Submit the abandonment permit; plug wells in pad, drive and utility areas |
| During site work | Stop and call if equipment uncovers an unknown casing; do not bury it |
| Before closeout | Collect completion documentation for the project file |
The permit has to be in place before the plugging starts, so building it into the schedule early keeps it from becoming the item that holds up the next trade.
If a Casing Turns Up During Site Work
Stop work around it, keep equipment off it and call. Do not knock it over, push fill into it or bury it. A buried well is still an abandoned well, and locating and exposing it later costs more than dealing with it now. If water starts flowing from it, see my well is flowing on its own.
Multi-Well Sites
Former agricultural land often has several wells, sometimes large diameter and deep. Each one needs to be plugged. Doing them together, on one mobilization, is usually more economical per well and simpler to schedule. We inventory the wells, permit them and plug them in an order that suits the site work.
Coordinating With the General Contractor
We work around the site schedule: access for our equipment, where materials and spoil go, when other trades are on site, and which wells need to be finished before a given stage. Tell us the schedule and we will tell you what we need and when.
Paperwork for the Project File
Each plugged well gets a permit and completion documentation. Keep it with the project records. It is what a lender, building department, buyer or future owner may ask for, sometimes years after the project closes.
Larger Projects
Builders and developers working across several sites, or on agricultural land conversions, can call to discuss the full scope. For how the work is done, see how a flow or artesian well is plugged; for cost drivers, including multi-well sites, well abandonment cost in Florida; and for permitting by county, well abandonment permits.
Brent Pump Works is a licensed water well contractor serving the Treasure Coast since 2004, handling artesian well abandonment across Martin, St. Lucie and Palm Beach counties.
Frequently Asked Questions
Do I have to plug an old well before I build?
If the well is abandoned, it has to be plugged under the rule regardless of construction. In practice it needs to be done before anything is built over or around it. Confirm with your local building department what your permit requires, and schedule the abandonment early so the permit is in place.
Can I build a slab or driveway over an old well?
Not over an unplugged one. An abandoned well has to be plugged from the bottom to the top with grout before it is covered. Building over an open well buries the problem rather than solving it, and locating it again later is expensive.
What happens if we find a well during site work?
Stop work around it, keep equipment off it, and call a licensed water well contractor. Do not knock it over or bury it. We will assess it, permit it and plug it in a way that fits the site schedule as closely as the well allows.
How do you handle land with several old wells?
We locate and inventory the wells, permit them, and plug them in the order that suits the site work. Doing several on one mobilization is usually more economical per well. Former groves and pasture often have more wells than anyone expected, so an early survey of the land helps.
How far ahead should a builder schedule well abandonment?
As early as possible, ideally during due diligence or before clearing. The permit must be in place before plugging begins and processing times vary by county office. Scheduling early keeps the well from holding up site work or the next trade.
Who is responsible for the well on a development site?
The owner of the property, under the South Florida Water Management District rule. On a construction project, the owner usually arranges it through the builder or developer, but the work itself must be done by a licensed water well contractor under a permit.
Can the site contractor plug the old well during grading?
No. Florida requires wells to be plugged by a licensed water well contractor under a permit, filled from the bottom to the top with grout. Burying or filling a well during grading does not meet the requirement and usually has to be undone.
What documentation do we get for the project file?
Each plugged well has its permit and its completion documentation, which together show it was abandoned under permit by a licensed water well contractor. Keep them with the project records, because lenders, building departments, buyers and future owners may ask for proof that the old wells were handled.